Tel: 86-510-86515678
;

News

Home > News
Measures to prevent explosion of liquid oxygen pump
Before starting the liquid oxygen pump to cool down, the blowing valve should be open and connected to the room temperature nitrogen blowing labyrinth for 10-20 minutes. On the one hand, the oxygen driver is left and at the same time the seal is returned to the normal temperature gap.

After turning, confirm that there is no fault, start the water pump, and pay attention to the stability of the inlet pressure of the pump. If the pressure fluctuates or the outlet pressure does not rise, cavitation may occur. The exhaust valve body on the pump must be opened to continue to cool the liquid oxygen pump. Stable to control the pressure of the sealing gas to be higher than the pressure of 01005-0101 MPa before the sealing.
Previous:  Another important use of ozone is for water...    Next:  Market demand for nitrogen generators

CORYRIGHT?2020 Jiangyin Shenma Machinery Equipment Co., Ltd.
蘇ICP備07001906號-2   公安部備案號:32028102000219 

主站蜘蛛池模板: 久久这里只有| 免费 的黄色| 伊人久久大香线蕉综合热线| 婷婷中文在线| 黄页网站大全在线观看| 国产精品国产三级国产普通话一| 真正免费一级毛片在线播放| 色在线综合| xxx视频在线观看免费| 99性视频| 久久久久久久久久久久久久久久久| 成人综合网站| 久久国产美女免费观看精品| 中文字幕久久欲求不满| 天天干狠狠| 国产成人综合网亚洲欧美在线| 一本色道久久综合狠狠躁| 国产黄色在线网站| 色爱区综合五月激情| 亚洲精品综合网| 免费国产黄| 2018天天干天天操| 就色干综合| 在线网站污| 古代级a毛片在线| 一级成人黄色片| www.一区二区三区| 日韩一区二区超清视频| 久久女人| 国产三级小视频| 色成人综合| 99国产成人高清在线视频| 很黄网站| 日日噜噜夜夜躁躁狠狠| 国产a级免费| 日本韩国一免费观看| 制服丝袜中文字幕在线| 97人人在线| 日韩高清免费观看| 日韩欧美网址| 天天操天天爽天天射|